Final documents

When we have agreed the plans and estimated construction costs with you, we hand them over to our associated architects and engineers, and instruct them to produce the structural plans and seismic calculations before preparing the building permit application on your behalf.

Once those documents have been produced, we will be advised of any special structural/seismic costs (if any) and importantly, the statutory costs involved (permit, IKA, VAT, etc.). At that point, we are able to agree a fixed-price fixed-time building contract with you, and all is then ready for construction to start as soon as the building permit has been approved.